Fit baggage bay bulkhead - floor before fitting fairings Frans
Date: 12/08/2010
Views: 2537
Klaus-Building-His-Plane
Date: 10/20/2009
Views: 13989
imm030_31A
Date: 09/03/2009
Views: 8161
Newest Image
EAA SITE
Date: 08/23/2023
Views: 163131
HeadlinerWiring11Ann
The overhead panel in place and the wiring for the lights completed. After the nutplates have been installed, the whole assembly will have to be primed and Zolatoned before the wiring is connected.