Date: 09/26/2007 Views: 3101
Date: 10/22/2006 Views: 2984
Date: 05/26/2009 Views: 3661
Date: 08/23/2023 Views: 160694
The now lengthened lines have been routed around the problem area and come in from the aft. The extensions have been connected to the fuel pump plumbing. This completes the fuel system aft of the firewall.