OK, we are ready for in situation fitting to get correct length and angle of 1" tube
Date: 11/27/2013
Views: 6895
IM002773
Date: 10/30/2007
Views: 7890
Filled with Aeropoxy light port.
Date: 09/03/2009
Views: 6434
Newest Image
EAA SITE
Date: 08/23/2023
Views: 722727
DSCN5582Ann
Here the first two lugs have been pulled in place. I couldn't get the rest in because the lower cowling blocks the lower holes. The rest of the lugs will go in after I have finished fitting the cowl and remove the lower.