Date: 04/23/2009 Views: 3442
Date: 10/17/2013 Views: 4870
Date: 04/26/2008 Views: 2357
Date: 08/23/2023 Views: 159743
Next job was installing spade connectors on the GRT EGT wiring harness. The spade connectors were connected to the appropriate connectors on the EGT sensor and heat shrink sleeve used to cover the connections.