Port front spacer complete and held in place with double sticky tape.
Date: 10/12/2009
Views: 3033
General Mono info, Tony Bale Y10-10-25.
Date: 10/26/2010
Views: 1834
completed_panel
Date: 03/01/2008
Views: 7455
Newest Image
EAA SITE
Date: 08/23/2023
Views: 182191
IMG_2261Ann
Doubled over about 1.5 cm of the end and then doubled over about 2.5 cm to make a fold in the end with three layers. The raw end on the inside. Used an awl to open a hole between the threads for a rivet to pass through. Used a washer on the other side and pulled the rivet. Didn't get the thread count right for rivet placement on this first one.