After module mounted with a few screws measured warp gap.
Date: 01/14/2010
Views: 3649
img0837copy
Date: 07/29/2007
Views: 2220
IMG_6404Ann
Date: 12/16/2007
Views: 3820
Newest Image
EAA SITE
Date: 08/23/2023
Views: 217538
DoorLatch09Ann
Prepared the layups with a layer of polyethylene sheet and a layer of peel-ply. Then added four layers of BID. Covered with another layer of peel-ply and topped with another layer of poly. The layups were put in place on the door frames, smoothed out, clamped down and allowed to cure overnight.