Date: 12/31/1969 Views: 4352
Date: 01/23/2013 Views: 21113
Date: 11/16/2010 Views: 6604
Date: 08/23/2023 Views: 781768
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.