Date: 12/12/2006 Views: 7258
Date: 07/13/2010 Views: 6631
Date: 06/12/2006 Views: 7827
Date: 08/23/2023 Views: 767338
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.