Date: 06/30/2003 Views: 3368
Date: 12/31/1969 Views: 2649
Date: 08/17/2009 Views: 2932
Date: 08/23/2023 Views: 93665
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.