Date: 12/31/1969 Views: 2680
Date: 02/28/2009 Views: 4870
Date: 04/26/2009 Views: 3352
Date: 08/23/2023 Views: 159962
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.