Date: 06/22/2009 Views: 3186
Date: 03/17/2008 Views: 3426
Date: 11/01/2007 Views: 3970
Date: 08/23/2023 Views: 186221
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.