Date: 01/14/2006 Views: 4805
Date: 12/31/1969 Views: 2696
Date: 12/23/2006 Views: 2593
Date: 08/23/2023 Views: 160044
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.