Date: 09/15/2009 Views: 3144
Date: 02/15/2008 Views: 3380
Date: 05/19/2008 Views: 6664
Date: 08/23/2023 Views: 210095
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.