Date: 08/03/2009 Views: 2928
Date: 12/31/2006 Views: 11693
Date: 10/11/2009 Views: 2915
Date: 08/23/2023 Views: 160111
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.