Date: 04/14/2009 Views: 3157
Date: 06/07/2007 Views: 3155
Date: 12/31/1969 Views: 3261
Date: 08/23/2023 Views: 103646
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.