Date: 12/31/1969 Views: 6748
Date: 05/02/2009 Views: 4858
Date: 10/19/2010 Views: 5266
Date: 08/23/2023 Views: 693395
While clamped, three holes were drilled for retainer hardware. One hole in the landing gear handle recess and two holes in the panel lower flange on the starboard side. The upper flange was marked for trim while the panel was clamped.