Date: 12/13/2009 Views: 5394
Date: 12/31/1969 Views: 7688
Date: 12/31/1969 Views: 6357
Date: 08/23/2023 Views: 804553
While clamped, three holes were drilled for retainer hardware. One hole in the landing gear handle recess and two holes in the panel lower flange on the starboard side. The upper flange was marked for trim while the panel was clamped.