Date: 05/19/2008 Views: 3727
Date: 07/20/2004 Views: 2352
Date: 07/15/2009 Views: 3338
Date: 08/23/2023 Views: 204988
While clamped, three holes were drilled for retainer hardware. One hole in the landing gear handle recess and two holes in the panel lower flange on the starboard side. The upper flange was marked for trim while the panel was clamped.