InstrumentPanel17Ann
The busses (MB-1, +12v & Ground) were positioned and the two flexi-buss strip were fastened in place with anchor nuts and screws. The MB-1 strip requires that screws and nuts be purchased to affix it. The +12v and Ground firewall through-bolts were installed and connected to their respective busses. The wiring from the aft of the fuselage were fitted and attached to the appropriate terminals. Two Clic-Bond cable tie bases were bonded in place.
|
Full size:
640x480
|