2 channel dimmable ceiling LED wiring schematic complete.
Date: 03/01/2009
Views: 4820
Newest Image
EAA SITE
Date: 08/23/2023
Views: 693395
InstrumentPanel33Ann
Installed a foundation for an AMP Flexi-Strip terminal strip to replace the TB-1 provided by Gulf Coast. Then mounted the TCU and routed the octopus of cables. Connected the TCU +12v/Ground wires. Eventually, there will have to be a firewall penetration for one of the cable so it can reach the engine connections.