Bonding port front spacer to fuse with JB KWIK weld.
Date: 10/12/2009
Views: 3096
Newest Image
EAA SITE
Date: 08/23/2023
Views: 160004
ThrottlePlate00
The center- line of the plate was measured and marked. The measurements for the throttle lever slot and screw holes were taken from the throttle quadrant and transferred to the back of the plate. A jig was set up to position the drill on the center -line of the plate.