Date: 12/02/2006 Views: 3551
Date: 06/19/2009 Views: 2789
Date: 03/02/2009 Views: 3282
Date: 08/23/2023 Views: 212439
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.