Date: 06/12/2010 Views: 3265
Date: 09/30/2005 Views: 2608
Date: 12/31/1969 Views: 2673
Date: 08/23/2023 Views: 101543
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.