Date: 06/14/2004 Views: 3854
Date: 01/05/2009 Views: 2913
Date: 12/31/1969 Views: 5488
Date: 08/23/2023 Views: 184671
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.