Date: 05/29/2004 Views: 2543
Date: 01/09/2010 Views: 4975
Date: 10/28/2007 Views: 7607
Date: 08/23/2023 Views: 161157
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.