Date: 12/31/1969 Views: 2966
Date: 05/15/2009 Views: 3161
Date: 02/12/2004 Views: 3479
Date: 08/23/2023 Views: 181461
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.