Date: 10/03/2005 Views: 3363
Date: 05/22/2005 Views: 3301
Date: 08/27/2011 Views: 5211
Date: 08/23/2023 Views: 170476
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.