Date: 04/15/2005 Views: 3869
Date: 04/07/2006 Views: 6478
Date: 10/25/2009 Views: 3068
Date: 08/23/2023 Views: 207423
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.