Date: 12/19/2006 Views: 2664
Date: 10/05/2008 Views: 3651
Date: 01/07/2006 Views: 4085
Date: 08/23/2023 Views: 196868
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.