Date: 10/25/2009 Views: 2379
Date: 09/11/2006 Views: 3104
Date: 12/31/1969 Views: 2261
Date: 08/23/2023 Views: 159760
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.