Date: 03/03/2016 Views: 5533
Date: 11/26/2006 Views: 4123
Date: 08/12/2003 Views: 6018
Date: 08/23/2023 Views: 160120
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.