Date: 12/31/1969 Views: 7890
Date: 06/09/2008 Views: 4884
Date: 05/21/2012 Views: 4548
Date: 08/23/2023 Views: 207201
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.