Date: 12/31/1969 Views: 2468
Date: 01/01/2009 Views: 3631
Date: 07/30/2011 Views: 2494
Date: 08/23/2023 Views: 167488
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.