Date: 02/03/2004 Views: 3403
Date: 08/04/2010 Views: 3100
Date: 08/03/2009 Views: 4290
Date: 08/23/2023 Views: 209587
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.