Date: 02/15/2004 Views: 4117
Date: 06/07/2009 Views: 2770
Date: 06/03/2007 Views: 2578
Date: 08/23/2023 Views: 113306
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.