Date: 07/19/2007 Views: 15486
Date: 01/25/2014 Views: 20582
Date: 03/02/2004 Views: 8544
Date: 08/23/2023 Views: 781999
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.