Date: 10/11/2003 Views: 5016
Date: 12/31/1969 Views: 10754
Date: 12/31/1969 Views: 3332
Date: 08/23/2023 Views: 181670
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.