Date: 04/15/2005 Views: 2917
Date: 11/14/2010 Views: 2973
Date: 08/10/2010 Views: 2804
Date: 08/23/2023 Views: 160139
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.