Date: 09/03/2009 Views: 4637
Date: 04/15/2005 Views: 3576
Date: 04/07/2006 Views: 5969
Date: 08/23/2023 Views: 160350
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.