Date: 03/22/2009 Views: 4112
Date: 10/25/2009 Views: 2513
Date: 04/09/2004 Views: 2875
Date: 08/23/2023 Views: 162145
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.