Date: 07/12/2004 Views: 3715
Date: 09/18/2003 Views: 5242
Date: 08/18/2009 Views: 3927
Date: 08/23/2023 Views: 186359
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.