Date: 12/31/1969 Views: 4604
Date: 02/05/2004 Views: 6278
Date: 08/20/2010 Views: 8352
Date: 08/23/2023 Views: 857715
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.