Date: 10/31/2008 Views: 8294
Date: 12/25/2013 Views: 9904
Date: 12/31/1969 Views: 8132
Date: 08/23/2023 Views: 704286
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.