Date: 12/31/1969 Views: 4646
Date: 05/22/2007 Views: 6384
Date: 08/24/2009 Views: 8714
Date: 08/23/2023 Views: 704281
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.