Date: 02/19/2006 Views: 3604
Date: 01/21/2006 Views: 4654
Date: 10/29/2004 Views: 6520
Date: 08/23/2023 Views: 210820
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.