Date: 12/31/1969 Views: 2767
Date: 12/31/1969 Views: 3200
Date: 03/31/2010 Views: 3626
Date: 08/23/2023 Views: 159953
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.