Date: 04/22/2007 Views: 3387
Date: 11/03/2009 Views: 3281
Date: 07/29/2007 Views: 3005
Date: 08/23/2023 Views: 159577
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.