Date: 11/13/2007 Views: 4287
Date: 03/04/2004 Views: 3537
Date: 12/31/1969 Views: 2761
Date: 08/23/2023 Views: 190381
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.