Date: 06/09/2004 Views: 2991
Date: 12/31/1969 Views: 3804
Date: 01/18/2008 Views: 3285
Date: 08/23/2023 Views: 218163
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.