Eric Engineering increase in force needed when cable is deflected 2
Date: 12/03/2013
Views: 4483
108_0816_IMG
Date: 10/12/2003
Views: 4510
Newest Image
EAA SITE
Date: 08/23/2023
Views: 202743
RudderMount28Ann
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.