Date: 12/31/1969 Views: 2901
Date: 05/05/2004 Views: 2570
Date: 12/29/2006 Views: 3388
Date: 08/23/2023 Views: 199397
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.