Date: 12/31/1969 Views: 3671
Date: 01/22/2010 Views: 3441
Date: 10/20/2010 Views: 3192
Date: 08/23/2023 Views: 216205
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.