Date: 07/12/2009 Views: 4789
Date: 12/31/1969 Views: 3073
Date: 02/01/2009 Views: 3399
Date: 08/23/2023 Views: 213202
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.