Date: 02/04/2009 Views: 2663
Date: 06/08/2010 Views: 3578
Date: 11/05/2010 Views: 3224
Date: 08/23/2023 Views: 183254
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.